Home > News

Operation and Maintenance Procedures for Pipe Threading Lathe

1 Scope

This standard specifies the operation and maintenance procedures for vertical lathes.

This standard is applicable to the operation and maintenance procedures of vertical lathe.

2 Normative References

The clauses in the following documents become clauses of this standard through reference in this standard. For dated reference documents, all subsequent amendments (excluding corrections) or revisions are not applicable to this standard. However, parties to agreements based on this standard are encouraged to study whether the latest versions of these documents can be used. For undated references, the latest version is applicable to this standard.

3 Operating procedures

3.1 The operator must be familiar with the general performance, structure and rotation system of the lathe, and it is strictly prohibited to use the equipment beyond the performance.

3.2 Before work:

3.2.1 Check whether the operating handle, switch, knob are in the correct position, whether the operation is flexible, and whether the limit and safety devices are complete and reliable.

3.2.2 Turn on the power supply, run the vehicle at low speed without load, and stop for inspection or report to the repair personnel in case of any abnormal response.

3.2.3 Check whether the liquid level indication height in the oil pointer is appropriate, whether the oil circuit is smooth, and add enough lubricating oil at the specified position.

3.2.4 Operate for 3-5 minutes at low speed without load, and start to work after confirming that the lubrication, electrical system and all parts operate normally.

3.3 During work:

3.3.1 It is prohibited to use beyond performance.

3.3.2 It is prohibited to place articles on the guide rail surface, beam surface, etc. of the machine tool.

3.3.3 It is forbidden to knock, straighten and trim the workpiece on the worktable.

3.3.4 The workpiece and tool must be fixed firmly and reliably.

3.3.7 Correctly use the tool holder rotation device and clamping mechanism.

3.3.8 Reasonably select the speed and cutting parameters.

3.3.9 When the machine tool is running, the operator is not allowed to leave the post.

3.3.10 In case of any abnormal phenomenon during operation, stop the machine immediately, find out the cause and deal with it in time.

3.4 After work:

3.4.1 All operating handles, switches and knobs must be placed at the stop position and the power supply must be cut off.

3.4.2 Carry out daily maintenance.

3.4.3 Fill in fixed equipment operation records and shift records.

4 Maintenance procedures

4.1 Make lubrication adjustment according to the patrol inspection parts and lubrication chart to ensure the lubrication times in the shift.

4.2 Check the oil indicator page and the oil supply condition of the oil pump.

4.3 Clean the oil holes and lubricating parts of each part and cover them with dust shields.

4.4 During the operation, according to the change of different processing materials, do a good job of chip removal, oil injection and lubrication.

4.4 Before going off duty, wipe off the dust and iron filings on the bed surface, spindle box, tool box and other parts, and coat them with antirust oil.


Shandong Luzhong Machine Tool Co.,Ltd.
  • Add.: NO.789, TENGYANG WEST ROAD, ECONOMIC DEVELOPMENT ZONE,TENGZHOU CITY, ZAOZHUANG CITY,SHANDONG PROVINCE,CHINA
  • Tel.: +86 632 5083 086
  • Fax: +86 632 5083 086
  • E-mail: info@luzhongmc.com
  • Skype: danica@luzhongmc.com
FOLLOW US

Copyright © Shandong Luzhong Machine Tool Co.,Ltd. All Rights Reserved

 

danica@luzhongmc.com

info@luzhongmc.com